Construction Industry Survey (41/49)
1 tables and 144 items from the KOSIS survey “Construction Industry Survey”, as annual figures and charts.
공사종류/등록업종별 계약액,기성액,원도급 및 하도급공사 기성액,미기성액
Back to top공사종류별 총계 · 등록업종별 합 계
- Value of orders received in original contract
- Building construction Value of orders received in original contract
- Detached & tenement house Value of orders received in original contract
- Apartment Value of orders received in original contract
- Residential shop Value of orders received in original contract
- Market department store Value of orders received in original contract
- Business building Value of orders received in original contract
- Public building Value of orders received in original contract
- Hotel & lodgings Value of orders received in original contract
- Educational facilities Value of orders received in original contract
- Hospital Value of orders received in original contract
- Church & temple Value of orders received in original contract
- Traditional style & Cultural building Value of orders received in original contract
- Public & Performance Value of orders received in original contract
- Stadium & playground Value of orders received in original contract
- Exhibition pavilion Value of orders received in original contract
- Factory & workshop Value of orders received in original contract
- Machine installation (except plant) Value of orders received in original contract
- Substation power plant Value of orders received in original contract
- Warehouse garage terminal building Value of orders received in original contract
- Hazardous property storehouse Value of orders received in original contract
- Other Building Facilities Value of orders received in original contract
- Civil engineering Value of orders received in original contract
- General road Value of orders received in original contract
- Value of construction completed
- Building construction Value of construction completed
- Detached & tenement house Value of construction completed
- Apartment Value of construction completed
- Residential shop Value of construction completed
- Market department store Value of construction completed
- Business building Value of construction completed
- Public building Value of construction completed
- Hotel & lodgings Value of construction completed
- Educational facilities Value of construction completed
- Hospital Value of construction completed
- Church & temple Value of construction completed
- Traditional style & Cultural building Value of construction completed
- Public & Performance Value of construction completed
- Stadium & playground Value of construction completed
- Exhibition pavilion Value of construction completed
- Factory & workshop Value of construction completed
- Machine installation (except plant) Value of construction completed
- Substation power plant Value of construction completed
- Warehouse garage terminal building Value of construction completed
- Hazardous property storehouse Value of construction completed
- Other Building Facilities Value of construction completed
- Civil engineering Value of construction completed
- General road Value of construction completed
- Value of construction completed in original contract
- Building construction Value of construction completed in original contract
- Detached & tenement house Value of construction completed in original contract
- Apartment Value of construction completed in original contract
- Residential shop Value of construction completed in original contract
- Market department store Value of construction completed in original contract
- Business building Value of construction completed in original contract
- Public building Value of construction completed in original contract
- Hotel & lodgings Value of construction completed in original contract
- Educational facilities Value of construction completed in original contract
- Hospital Value of construction completed in original contract
- Church & temple Value of construction completed in original contract
- Traditional style & Cultural building Value of construction completed in original contract
- Public & Performance Value of construction completed in original contract
- Stadium & playground Value of construction completed in original contract
- Exhibition pavilion Value of construction completed in original contract
- Factory & workshop Value of construction completed in original contract
- Machine installation (except plant) Value of construction completed in original contract
- Substation power plant Value of construction completed in original contract
- Warehouse garage terminal building Value of construction completed in original contract
- Hazardous property storehouse Value of construction completed in original contract
- Other Building Facilities Value of construction completed in original contract
- Civil engineering Value of construction completed in original contract
- General road Value of construction completed in original contract
- Value of construction completed in subcontract
- Building construction Value of construction completed in subcontract
- Detached & tenement house Value of construction completed in subcontract
- Apartment Value of construction completed in subcontract
- Residential shop Value of construction completed in subcontract
- Market department store Value of construction completed in subcontract
- Business building Value of construction completed in subcontract
- Public building Value of construction completed in subcontract
- Hotel & lodgings Value of construction completed in subcontract
- Educational facilities Value of construction completed in subcontract
- Hospital Value of construction completed in subcontract
- Church & temple Value of construction completed in subcontract
- Traditional style & Cultural building Value of construction completed in subcontract
- Public & Performance Value of construction completed in subcontract
- Stadium & playground Value of construction completed in subcontract
- Exhibition pavilion Value of construction completed in subcontract
- Factory & workshop Value of construction completed in subcontract
- Machine installation (except plant) Value of construction completed in subcontract
- Substation power plant Value of construction completed in subcontract
- Warehouse garage terminal building Value of construction completed in subcontract
- Hazardous property storehouse Value of construction completed in subcontract
- Other Building Facilities Value of construction completed in subcontract
- Civil engineering Value of construction completed in subcontract
- General road Value of construction completed in subcontract
- Value of carry-over work
- Building construction Value of carry-over work
- Detached & tenement house Value of carry-over work
- Apartment Value of carry-over work
- Residential shop Value of carry-over work
- Market department store Value of carry-over work
- Business building Value of carry-over work
- Public building Value of carry-over work
- Hotel & lodgings Value of carry-over work
- Educational facilities Value of carry-over work
- Hospital Value of carry-over work
- Church & temple Value of carry-over work
- Traditional style & Cultural building Value of carry-over work
- Public & Performance Value of carry-over work
- Stadium & playground Value of carry-over work
- Exhibition pavilion Value of carry-over work
- Factory & workshop Value of carry-over work
- Machine installation (except plant) Value of carry-over work
- Substation power plant Value of carry-over work
- Warehouse garage terminal building Value of carry-over work
- Hazardous property storehouse Value of carry-over work
- Other Building Facilities Value of carry-over work
- Civil engineering Value of carry-over work
- General road Value of carry-over work
- Value of orders received
- Building construction Value of orders received
- Detached & tenement house Value of orders received
- Apartment Value of orders received
- Residential shop Value of orders received
- Market department store Value of orders received
- Business building Value of orders received
- Public building Value of orders received
- Hotel & lodgings Value of orders received
- Educational facilities Value of orders received
- Hospital Value of orders received
- Church & temple Value of orders received
- Traditional style & Cultural building Value of orders received
- Public & Performance Value of orders received
- Stadium & playground Value of orders received
- Exhibition pavilion Value of orders received
- Factory & workshop Value of orders received
- Machine installation (except plant) Value of orders received
- Substation power plant Value of orders received
- Warehouse garage terminal building Value of orders received
- Hazardous property storehouse Value of orders received
- Other Building Facilities Value of orders received
- Civil engineering Value of orders received
- General road Value of orders received
Value of orders received in original contract
2008 228,298,526Mill. Won→2024 308,337,031Mill. Won▲ +35.1%
Building construction Value of orders received in original contract
2008 109,144,484Mill. Won→2024 187,968,505Mill. Won▲ +72.2%
Detached & tenement house Value of orders received in original contract
2008 2,253,290Mill. Won→2024 7,692,729Mill. Won▲ +241.4%
Apartment Value of orders received in original contract
2008 32,340,690Mill. Won→2024 63,834,853Mill. Won▲ +97.4%
Residential shop Value of orders received in original contract
2008 7,256,234Mill. Won→2024 8,183,716Mill. Won▲ +12.8%
Market department store Value of orders received in original contract
2008 5,670,580Mill. Won→2024 5,680,451Mill. Won▲ +0.2%
Business building Value of orders received in original contract
2008 8,495,457Mill. Won→2024 18,796,968Mill. Won▲ +121.3%
Public building Value of orders received in original contract
2008 3,517,940Mill. Won→2024 6,939,160Mill. Won▲ +97.3%
Hotel & lodgings Value of orders received in original contract
2008 3,718,237Mill. Won→2024 2,874,114Mill. Won▼ −22.7%
Educational facilities Value of orders received in original contract
2008 6,737,229Mill. Won→2024 11,384,148Mill. Won▲ +69.0%
Hospital Value of orders received in original contract
2008 2,090,534Mill. Won→2024 2,673,832Mill. Won▲ +27.9%
Church & temple Value of orders received in original contract
2008 1,241,868Mill. Won→2024 1,106,384Mill. Won▼ −10.9%
Traditional style & Cultural building Value of orders received in original contract
2008 124,959Mill. Won→2024 92,468Mill. Won▼ −26.0%
Public & Performance Value of orders received in original contract
2008 741,583Mill. Won→2024 935,735Mill. Won▲ +26.2%
Stadium & playground Value of orders received in original contract
2008 1,139,109Mill. Won→2024 2,157,247Mill. Won▲ +89.4%
Exhibition pavilion Value of orders received in original contract
2008 1,266,072Mill. Won→2024 917,483Mill. Won▼ −27.5%
Factory & workshop Value of orders received in original contract
2008 14,076,320Mill. Won→2024 35,080,393Mill. Won▲ +149.2%
Machine installation (except plant) Value of orders received in original contract
2008 2,433,879Mill. Won→2024 193,460Mill. Won▼ −92.1%
Substation power plant Value of orders received in original contract
2008 649,611Mill. Won→2024 723,836Mill. Won▲ +11.4%
Warehouse garage terminal building Value of orders received in original contract
2008 1,688,886Mill. Won→2024 7,709,777Mill. Won▲ +356.5%
Hazardous property storehouse Value of orders received in original contract
2008 225,759Mill. Won→2024 319,540Mill. Won▲ +41.5%
Other Building Facilities Value of orders received in original contract
2008 13,476,237Mill. Won→2024 10,672,211Mill. Won▼ −20.8%
Civil engineering Value of orders received in original contract
2008 73,915,834Mill. Won→2024 58,604,039Mill. Won▼ −20.7%
General road Value of orders received in original contract
2008 12,500,187Mill. Won→2024 7,352,363Mill. Won▼ −41.2%
Value of construction completed
2008 211,555,501Million Won→2024 363,827,822Million Won▲ +72.0%
Building construction Value of construction completed
2008 114,631,733Million Won→2024 248,489,486Million Won▲ +116.8%
Detached & tenement house Value of construction completed
2008 1,743,318Million Won→2024 4,531,147Million Won▲ +159.9%
Apartment Value of construction completed
2008 43,274,965Million Won→2024 75,893,064Million Won▲ +75.4%
Residential shop Value of construction completed
2008 4,989,515Million Won→2024 16,836,624Million Won▲ +237.4%
Market department store Value of construction completed
2008 5,411,710Million Won→2024 4,973,089Million Won▼ −8.1%
Business building Value of construction completed
2008 7,583,872Million Won→2024 32,543,945Million Won▲ +329.1%
Public building Value of construction completed
2008 3,852,131Million Won→2024 8,487,641Million Won▲ +120.3%
Hotel & lodgings Value of construction completed
2008 3,177,521Million Won→2024 5,726,306Million Won▲ +80.2%
Educational facilities Value of construction completed
2008 7,391,690Million Won→2024 12,831,411Million Won▲ +73.6%
Hospital Value of construction completed
2008 2,109,255Million Won→2024 3,351,226Million Won▲ +58.9%
Church & temple Value of construction completed
2008 1,066,960Million Won→2024 1,152,520Million Won▲ +8.0%
Traditional style & Cultural building Value of construction completed
2008 132,389Million Won→2024 89,261Million Won▼ −32.6%
Public & Performance Value of construction completed
2008 684,679Million Won→2024 793,742Million Won▲ +15.9%
Stadium & playground Value of construction completed
2008 1,040,378Million Won→2024 1,844,115Million Won▲ +77.3%
Exhibition pavilion Value of construction completed
2008 1,045,906Million Won→2024 905,086Million Won▼ −13.5%
Factory & workshop Value of construction completed
2008 15,053,892Million Won→2024 55,777,322Million Won▲ +270.5%
Machine installation (except plant) Value of construction completed
2008 1,102,162Million Won→2024 486,598Million Won▼ −55.9%
Substation power plant Value of construction completed
2008 1,277,190Million Won→2024 891,920Million Won▼ −30.2%
Warehouse garage terminal building Value of construction completed
2008 2,256,155Million Won→2024 11,498,605Million Won▲ +409.7%
Hazardous property storehouse Value of construction completed
2008 219,728Million Won→2024 264,740Million Won▲ +20.5%
Other Building Facilities Value of construction completed
2008 11,218,307Million Won→2024 9,611,121Million Won▼ −14.3%
Civil engineering Value of construction completed
2008 59,429,142Million Won→2024 55,771,477Million Won▼ −6.2%
General road Value of construction completed
2008 8,247,953Million Won→2024 7,926,278Million Won▼ −3.9%
Value of construction completed in original contract
2008 145,571,069Million Won→2024 240,164,060Million Won▲ +65.0%
Building construction Value of construction completed in original contract
2008 75,780,877Million Won→2024 155,404,012Million Won▲ +105.1%
Detached & tenement house Value of construction completed in original contract
2008 1,324,610Million Won→2024 3,290,496Million Won▲ +148.4%
Apartment Value of construction completed in original contract
2008 27,790,189Million Won→2024 41,544,238Million Won▲ +49.5%
Residential shop Value of construction completed in original contract
2008 3,440,421Million Won→2024 9,656,612Million Won▲ +180.7%
Market department store Value of construction completed in original contract
2008 3,901,676Million Won→2024 3,581,060Million Won▼ −8.2%
Business building Value of construction completed in original contract
2008 5,350,693Million Won→2024 19,403,294Million Won▲ +262.6%
Public building Value of construction completed in original contract
2008 2,584,479Million Won→2024 6,047,696Million Won▲ +134.0%
Hotel & lodgings Value of construction completed in original contract
2008 2,247,182Million Won→2024 2,967,370Million Won▲ +32.0%
Educational facilities Value of construction completed in original contract
2008 4,606,299Million Won→2024 9,597,033Million Won▲ +108.3%
Hospital Value of construction completed in original contract
2008 1,304,144Million Won→2024 2,127,664Million Won▲ +63.1%
Church & temple Value of construction completed in original contract
2008 654,611Million Won→2024 775,265Million Won▲ +18.4%
Traditional style & Cultural building Value of construction completed in original contract
2008 91,190Million Won→2024 73,264Million Won▼ −19.7%
Public & Performance Value of construction completed in original contract
2008 451,257Million Won→2024 544,054Million Won▲ +20.6%
Stadium & playground Value of construction completed in original contract
2008 565,458Million Won→2024 1,236,118Million Won▲ +118.6%
Exhibition pavilion Value of construction completed in original contract
2008 783,343Million Won→2024 618,069Million Won▼ −21.1%
Factory & workshop Value of construction completed in original contract
2008 9,983,085Million Won→2024 38,734,446Million Won▲ +288.0%
Machine installation (except plant) Value of construction completed in original contract
2008 775,965Million Won→2024 301,764Million Won▼ −61.1%
Substation power plant Value of construction completed in original contract
2008 970,256Million Won→2024 639,290Million Won▼ −34.1%
Warehouse garage terminal building Value of construction completed in original contract
2008 1,546,313Million Won→2024 6,767,881Million Won▲ +337.7%
Hazardous property storehouse Value of construction completed in original contract
2008 168,077Million Won→2024 173,099Million Won▲ +3.0%
Other Building Facilities Value of construction completed in original contract
2008 7,241,617Million Won→2024 7,325,298Million Won▲ +1.2%
Civil engineering Value of construction completed in original contract
2008 39,253,817Million Won→2024 40,047,554Million Won▲ +2.0%
General road Value of construction completed in original contract
2008 5,440,168Million Won→2024 6,298,344Million Won▲ +15.8%
Value of construction completed in subcontract
2008 65,984,431Million Won→2024 123,663,762Million Won▲ +87.4%
Building construction Value of construction completed in subcontract
2008 38,850,855Million Won→2024 93,085,473Million Won▲ +139.6%
Detached & tenement house Value of construction completed in subcontract
2008 418,707Million Won→2024 1,240,651Million Won▲ +196.3%
Apartment Value of construction completed in subcontract
2008 15,484,775Million Won→2024 34,348,826Million Won▲ +121.8%
Residential shop Value of construction completed in subcontract
2008 1,549,094Million Won→2024 7,180,012Million Won▲ +363.5%
Market department store Value of construction completed in subcontract
2008 1,510,034Million Won→2024 1,392,029Million Won▼ −7.8%
Business building Value of construction completed in subcontract
2008 2,233,179Million Won→2024 13,140,651Million Won▲ +488.4%
Public building Value of construction completed in subcontract
2008 1,267,652Million Won→2024 2,439,945Million Won▲ +92.5%
Hotel & lodgings Value of construction completed in subcontract
2008 930,338Million Won→2024 2,758,936Million Won▲ +196.6%
Educational facilities Value of construction completed in subcontract
2008 2,785,390Million Won→2024 3,234,379Million Won▲ +16.1%
Hospital Value of construction completed in subcontract
2008 805,111Million Won→2024 1,223,563Million Won▲ +52.0%
Church & temple Value of construction completed in subcontract
2008 412,348Million Won→2024 377,255Million Won▼ −8.5%
Traditional style & Cultural building Value of construction completed in subcontract
2008 41,198Million Won→2024 15,997Million Won▼ −61.2%
Public & Performance Value of construction completed in subcontract
2008 233,421Million Won→2024 249,689Million Won▲ +7.0%
Stadium & playground Value of construction completed in subcontract
2008 474,920Million Won→2024 607,997Million Won▲ +28.0%
Exhibition pavilion Value of construction completed in subcontract
2008 262,562Million Won→2024 287,017Million Won▲ +9.3%
Factory & workshop Value of construction completed in subcontract
2008 5,070,807Million Won→2024 17,042,876Million Won▲ +236.1%
Machine installation (except plant) Value of construction completed in subcontract
2008 326,196Million Won→2024 184,834Million Won▼ −43.3%
Substation power plant Value of construction completed in subcontract
2008 306,933Million Won→2024 252,630Million Won▼ −17.7%
Warehouse garage terminal building Value of construction completed in subcontract
2008 709,841Million Won→2024 4,730,724Million Won▲ +566.4%
Hazardous property storehouse Value of construction completed in subcontract
2008 51,651Million Won→2024 91,641Million Won▲ +77.4%
Other Building Facilities Value of construction completed in subcontract
2008 3,976,689Million Won→2024 2,285,823Million Won▼ −42.5%
Civil engineering Value of construction completed in subcontract
2008 20,175,325Million Won→2024 15,723,923Million Won▼ −22.1%
General road Value of construction completed in subcontract
2008 2,807,785Million Won→2024 1,627,934Million Won▼ −42.0%
Value of carry-over work
2008 356,583,238Million Won→2024 649,054,323Million Won▲ +82.0%
Building construction Value of carry-over work
2008 176,924,504Million Won→2024 395,055,162Million Won▲ +123.3%
Detached & tenement house Value of carry-over work
2008 2,012,071Million Won→2024 7,458,604Million Won▲ +270.7%
Apartment Value of carry-over work
2008 96,537,596Million Won→2024 204,203,191Million Won▲ +111.5%
Residential shop Value of carry-over work
2008 14,223,684Million Won→2024 31,058,336Million Won▲ +118.4%
Market department store Value of carry-over work
2008 5,773,604Million Won→2024 4,896,729Million Won▼ −15.2%
Business building Value of carry-over work
2008 10,917,456Million Won→2024 39,076,860Million Won▲ +257.9%
Public building Value of carry-over work
2008 2,348,236Million Won→2024 6,317,884Million Won▲ +169.0%
Hotel & lodgings Value of carry-over work
2008 5,798,116Million Won→2024 10,048,515Million Won▲ +73.3%
Educational facilities Value of carry-over work
2008 5,228,137Million Won→2024 9,116,427Million Won▲ +74.4%
Hospital Value of carry-over work
2008 2,462,834Million Won→2024 4,140,878Million Won▲ +68.1%
Church & temple Value of carry-over work
2008 1,154,788Million Won→2024 1,278,160Million Won▲ +10.7%
Traditional style & Cultural building Value of carry-over work
2008 110,674Million Won→2024 61,148Million Won▼ −44.7%
Public & Performance Value of carry-over work
2008 810,629Million Won→2024 1,698,923Million Won▲ +109.6%
Stadium & playground Value of carry-over work
2008 1,000,090Million Won→2024 2,689,651Million Won▲ +168.9%
Exhibition pavilion Value of carry-over work
2008 973,910Million Won→2024 744,900Million Won▼ −23.5%
Factory & workshop Value of carry-over work
2008 7,583,156Million Won→2024 48,261,987Million Won▲ +536.4%
Machine installation (except plant) Value of carry-over work
2008 3,031,181Million Won→2024 122,157Million Won▼ −96.0%
Substation power plant Value of carry-over work
2008 2,857,263Million Won→2024 2,001,493Million Won▼ −30.0%
Warehouse garage terminal building Value of carry-over work
2008 2,987,296Million Won→2024 13,364,087Million Won▲ +347.4%
Hazardous property storehouse Value of carry-over work
2008 64,857Million Won→2024 265,532Million Won▲ +309.4%
Other Building Facilities Value of carry-over work
2008 11,048,916Million Won→2024 8,249,699Million Won▼ −25.3%
Civil engineering Value of carry-over work
2008 104,990,998Million Won→2024 106,758,325Million Won▲ +1.7%
General road Value of carry-over work
2008 17,059,312Million Won→2024 8,788,865Million Won▼ −48.5%
Value of orders received
2008 283,780,498Million Won→2024 384,771,680Million Won▲ +35.6%
Building construction Value of orders received
2008 142,288,740Million Won→2024 244,884,975Million Won▲ +72.1%
Detached & tenement house Value of orders received
2008 2,700,703Million Won→2024 8,560,754Million Won▲ +217.0%
Apartment Value of orders received
2008 46,171,136Million Won→2024 86,898,137Million Won▲ +88.2%
Residential shop Value of orders received
2008 8,661,393Million Won→2024 11,778,999Million Won▲ +36.0%
Market department store Value of orders received
2008 6,652,007Million Won→2024 6,760,171Million Won▲ +1.6%
Business building Value of orders received
2008 10,313,284Million Won→2024 25,386,041Million Won▲ +146.1%
Public building Value of orders received
2008 4,633,764Million Won→2024 8,440,996Million Won▲ +82.2%
Hotel & lodgings Value of orders received
2008 4,407,642Million Won→2024 4,415,646Million Won▲ +0.2%
Educational facilities Value of orders received
2008 9,019,084Million Won→2024 14,118,709Million Won▲ +56.5%
Hospital Value of orders received
2008 2,710,820Million Won→2024 3,424,501Million Won▲ +26.3%
Church & temple Value of orders received
2008 1,634,380Million Won→2024 1,415,000Million Won▼ −13.4%
Traditional style & Cultural building Value of orders received
2008 156,069Million Won→2024 106,592Million Won▼ −31.7%
Public & Performance Value of orders received
2008 957,025Million Won→2024 1,172,008Million Won▲ +22.5%
Stadium & playground Value of orders received
2008 1,499,360Million Won→2024 2,788,809Million Won▲ +86.0%
Exhibition pavilion Value of orders received
2008 1,482,215Million Won→2024 1,166,012Million Won▼ −21.3%
Factory & workshop Value of orders received
2008 18,122,417Million Won→2024 43,987,225Million Won▲ +142.7%
Machine installation (except plant) Value of orders received
2008 2,668,008Million Won→2024 272,068Million Won▼ −89.8%
Substation power plant Value of orders received
2008 989,356Million Won→2024 920,219Million Won▼ −7.0%
Warehouse garage terminal building Value of orders received
2008 2,280,236Million Won→2024 10,344,123Million Won▲ +353.6%
Hazardous property storehouse Value of orders received
2008 276,276Million Won→2024 398,390Million Won▲ +44.2%
Other Building Facilities Value of orders received
2008 16,953,556Million Won→2024 12,530,575Million Won▼ −26.1%
Civil engineering Value of orders received
2008 90,394,248Million Won→2024 69,278,803Million Won▼ −23.4%
General road Value of orders received
2008 14,918,539Million Won→2024 8,447,692Million Won▼ −43.4%
Data source
- Organization
- 통계청
- Dataset
- 산업세분류 및 조직형태별 총괄
- Provider
- KOSIS 국가통계포털
- Period
- 2008 ~ 2024
- As of
- 2026-08-29
- Processing
- KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
Other surveys in this category
- Construction Industry Survey1 tables · 102 items
- Construction Business Trend Survey13 tables · 159 items
- Building Permit, Start and Completion Statistics4 tables · 26 items
- Building Statistics1 tables · 113 items
- Urban Redevelopment Project Status5 tables · 26 items
- Overseas Construction Orders Statistics3 tables · 78 items