Construction Industry Survey (31/49)
2 tables and 168 items from the KOSIS survey “Construction Industry Survey”, as annual figures and charts.
공사지역/공사종류별 계약액,기성액,미기성액(해외건설)
Back to top공사종류별 총계 · 공사지역별 총계
- Value of orders received in original contract
- Building construction Value of orders received in original contract
- Detached & tenement house Value of orders received in original contract
- Apartment Value of orders received in original contract
- Residential shop Value of orders received in original contract
- Market department store Value of orders received in original contract
- Business building Value of orders received in original contract
- Public building Value of orders received in original contract
- Hotel & lodgings Value of orders received in original contract
- Educational facilities Value of orders received in original contract
- Hospital Value of orders received in original contract
- Exhibition pavilion Value of orders received in original contract
- Factory & workshop Value of orders received in original contract
- Machine installation (except plant) Value of orders received in original contract
- Substation power plant Value of orders received in original contract
- Warehouse garage terminal building Value of orders received in original contract
- Other Building Facilities Value of orders received in original contract
- Civil engineering Value of orders received in original contract
- General road Value of orders received in original contract
- Value of construction completed
- Building construction Value of construction completed
- Detached & tenement house Value of construction completed
- Apartment Value of construction completed
- Residential shop Value of construction completed
- Market department store Value of construction completed
- Business building Value of construction completed
- Public building Value of construction completed
- Hotel & lodgings Value of construction completed
- Educational facilities Value of construction completed
- Hospital Value of construction completed
- Public & Performance Value of construction completed
- Stadium & playground Value of construction completed
- Exhibition pavilion Value of construction completed
- Factory & workshop Value of construction completed
- Machine installation (except plant) Value of construction completed
- Substation power plant Value of construction completed
- Warehouse garage terminal building Value of construction completed
- Hazardous property storehouse Value of construction completed
- Other Building Facilities Value of construction completed
- Civil engineering Value of construction completed
- General road Value of construction completed
- Value of construction completed in original contract
- Building construction Value of construction completed in original contract
- Detached & tenement house Value of construction completed in original contract
- Apartment Value of construction completed in original contract
- Residential shop Value of construction completed in original contract
- Market department store Value of construction completed in original contract
- Business building Value of construction completed in original contract
- Public building Value of construction completed in original contract
- Hotel & lodgings Value of construction completed in original contract
- Educational facilities Value of construction completed in original contract
- Hospital Value of construction completed in original contract
- Public & Performance Value of construction completed in original contract
- Stadium & playground Value of construction completed in original contract
- Exhibition pavilion Value of construction completed in original contract
- Factory & workshop Value of construction completed in original contract
- Machine installation (except plant) Value of construction completed in original contract
- Substation power plant Value of construction completed in original contract
- Warehouse garage terminal building Value of construction completed in original contract
- Hazardous property storehouse Value of construction completed in original contract
- Other Building Facilities Value of construction completed in original contract
- Civil engineering Value of construction completed in original contract
- General road Value of construction completed in original contract
- Value of construction completed in subcontract
- Building construction Value of construction completed in subcontract
- Detached & tenement house Value of construction completed in subcontract
- Apartment Value of construction completed in subcontract
- Residential shop Value of construction completed in subcontract
- Market department store Value of construction completed in subcontract
- Business building Value of construction completed in subcontract
- Public building Value of construction completed in subcontract
- Hotel & lodgings Value of construction completed in subcontract
- Educational facilities Value of construction completed in subcontract
- Hospital Value of construction completed in subcontract
- Stadium & playground Value of construction completed in subcontract
- Exhibition pavilion Value of construction completed in subcontract
- Factory & workshop Value of construction completed in subcontract
- Machine installation (except plant) Value of construction completed in subcontract
- Substation power plant Value of construction completed in subcontract
- Warehouse garage terminal building Value of construction completed in subcontract
- Other Building Facilities Value of construction completed in subcontract
- Civil engineering Value of construction completed in subcontract
- General road Value of construction completed in subcontract
- Value of carry-over work
- Building construction Value of carry-over work
- Detached & tenement house Value of carry-over work
- Apartment Value of carry-over work
- Residential shop Value of carry-over work
- Market department store Value of carry-over work
- Business building Value of carry-over work
- Public building Value of carry-over work
- Hotel & lodgings Value of carry-over work
- Educational facilities Value of carry-over work
- Hospital Value of carry-over work
- Church & temple Value of carry-over work
- Public & Performance Value of carry-over work
- Stadium & playground Value of carry-over work
- Exhibition pavilion Value of carry-over work
- Factory & workshop Value of carry-over work
- Machine installation (except plant) Value of carry-over work
- Substation power plant Value of carry-over work
- Warehouse garage terminal building Value of carry-over work
- Hazardous property storehouse Value of carry-over work
- Other Building Facilities Value of carry-over work
- Civil engineering Value of carry-over work
- General road Value of carry-over work
Value of orders received in original contract
2013 67,905,801Mill. Won→2023 39,719,453Mill. Won▼ −41.5%
Building construction Value of orders received in original contract
2013 8,024,012Mill. Won→2023 7,072,778Mill. Won▼ −11.9%
Detached & tenement house Value of orders received in original contract
2013 71,854Mill. Won→2023 42,338Mill. Won▼ −41.1%
Apartment Value of orders received in original contract
2013 120,777Mill. Won→2023 889,450Mill. Won▲ +636.4%
Residential shop Value of orders received in original contract
2013 963,529Mill. Won→2023 6,744Mill. Won▼ −99.3%
Market department store Value of orders received in original contract
2013 1,304,562Mill. Won→2023 3,973Mill. Won▼ −99.7%
Business building Value of orders received in original contract
2013 1,023,035Mill. Won→2023 1,203,616Mill. Won▲ +17.7%
Public building Value of orders received in original contract
2013 397,801Mill. Won→2023 18,347Mill. Won▼ −95.4%
Hotel & lodgings Value of orders received in original contract
2013 564,307Mill. Won→2023 596,154Mill. Won▲ +5.6%
Educational facilities Value of orders received in original contract
2013 191,357Mill. Won→2023 36,936Mill. Won▼ −80.7%
Hospital Value of orders received in original contract
2013 119,413Mill. Won→2023 17,325Mill. Won▼ −85.5%
Exhibition pavilion Value of orders received in original contract
2013 35,268Mill. Won→2023 7,376Mill. Won▼ −79.1%
Factory & workshop Value of orders received in original contract
2013 2,211,206Mill. Won→2023 4,116,946Mill. Won▲ +86.2%
Machine installation (except plant) Value of orders received in original contract
2013 2,095Mill. Won→2023 197Mill. Won▼ −90.6%
Substation power plant Value of orders received in original contract
2013 476,935Mill. Won→2023 8,697Mill. Won▼ −98.2%
Warehouse garage terminal building Value of orders received in original contract
2013 164,363Mill. Won→2023 91,868Mill. Won▼ −44.1%
Other Building Facilities Value of orders received in original contract
2013 238,103Mill. Won→2023 23,805Mill. Won▼ −90.0%
Civil engineering Value of orders received in original contract
2013 18,010,393Mill. Won→2023 3,550,158Mill. Won▼ −80.3%
General road Value of orders received in original contract
2013 279,962Mill. Won→2023 145,752Mill. Won▼ −47.9%
Value of construction completed
2008 32,736,151Million Won→2023 40,571,761Million Won▲ +23.9%
Building construction Value of construction completed
2008 7,051,808Million Won→2023 14,120,009Million Won▲ +100.2%
Detached & tenement house Value of construction completed
2008 85,388Million Won→2023 31,111Million Won▼ −63.6%
Apartment Value of construction completed
2008 489,321Million Won→2023 401,974Million Won▼ −17.9%
Residential shop Value of construction completed
2008 321,334Million Won→2023 198,546Million Won▼ −38.2%
Market department store Value of construction completed
2008 356,704Million Won→2023 280,228Million Won▼ −21.4%
Business building Value of construction completed
2008 576,146Million Won→2023 466,122Million Won▼ −19.1%
Public building Value of construction completed
2008 55,142Million Won→2023 41,955Million Won▼ −23.9%
Hotel & lodgings Value of construction completed
2008 654,478Million Won→2023 346,033Million Won▼ −47.1%
Educational facilities Value of construction completed
2008 122,767Million Won→2023 30,411Million Won▼ −75.2%
Hospital Value of construction completed
2008 65,887Million Won→2023 190,136Million Won▲ +188.6%
Public & Performance Value of construction completed
2008 22,986Million Won→2023 11Million Won▼ −100.0%
Stadium & playground Value of construction completed
2008 1,764Million Won→2023 24,117Million Won▲ +1267.2%
Exhibition pavilion Value of construction completed
2008 113,052Million Won→2023 6,061Million Won▼ −94.6%
Factory & workshop Value of construction completed
2008 2,051,125Million Won→2023 11,814,827Million Won▲ +476.0%
Machine installation (except plant) Value of construction completed
2008 27,889Million Won→2023 184Million Won▼ −99.3%
Substation power plant Value of construction completed
2008 620,337Million Won→2023 22,123Million Won▼ −96.4%
Warehouse garage terminal building Value of construction completed
2008 456,622Million Won→2023 249,530Million Won▼ −45.4%
Hazardous property storehouse Value of construction completed
2008 68Million Won→2019 4,524Million Won▲ +6552.9%
Other Building Facilities Value of construction completed
2008 1,030,003Million Won→2023 16,638Million Won▼ −98.4%
Civil engineering Value of construction completed
2008 6,995,266Million Won→2023 6,880,564Million Won▼ −1.6%
General road Value of construction completed
2008 594,716Million Won→2023 415,423Million Won▼ −30.1%
Value of construction completed in original contract
2008 30,853,867Million Won→2023 38,033,629Million Won▲ +23.3%
Building construction Value of construction completed in original contract
2008 6,396,676Million Won→2023 13,543,486Million Won▲ +111.7%
Detached & tenement house Value of construction completed in original contract
2008 78,520Million Won→2023 15,862Million Won▼ −79.8%
Apartment Value of construction completed in original contract
2008 450,136Million Won→2023 399,860Million Won▼ −11.2%
Residential shop Value of construction completed in original contract
2008 301,948Million Won→2023 198,320Million Won▼ −34.3%
Market department store Value of construction completed in original contract
2008 248,830Million Won→2023 267,133Million Won▲ +7.4%
Business building Value of construction completed in original contract
2008 545,514Million Won→2023 445,469Million Won▼ −18.3%
Public building Value of construction completed in original contract
2008 39,520Million Won→2023 26,596Million Won▼ −32.7%
Hotel & lodgings Value of construction completed in original contract
2008 574,492Million Won→2023 333,483Million Won▼ −42.0%
Educational facilities Value of construction completed in original contract
2008 22,680Million Won→2023 28,960Million Won▲ +27.7%
Hospital Value of construction completed in original contract
2008 57,573Million Won→2023 180,923Million Won▲ +214.2%
Public & Performance Value of construction completed in original contract
2008 20,988Million Won→2023 11Million Won▼ −99.9%
Stadium & playground Value of construction completed in original contract
2008 1,619Million Won→2023 23,477Million Won▲ +1350.1%
Exhibition pavilion Value of construction completed in original contract
2008 106,621Million Won→2023 5,108Million Won▼ −95.2%
Factory & workshop Value of construction completed in original contract
2008 1,906,849Million Won→2023 11,370,194Million Won▲ +496.3%
Machine installation (except plant) Value of construction completed in original contract
2008 855Million Won→2023 179Million Won▼ −79.1%
Substation power plant Value of construction completed in original contract
2008 585,217Million Won→2023 15,565Million Won▼ −97.3%
Warehouse garage terminal building Value of construction completed in original contract
2008 455,753Million Won→2023 223,855Million Won▼ −50.9%
Hazardous property storehouse Value of construction completed in original contract
2008 62Million Won→2019 4,524Million Won▲ +7196.8%
Other Building Facilities Value of construction completed in original contract
2008 999,333Million Won→2023 8,490Million Won▼ −99.2%
Civil engineering Value of construction completed in original contract
2008 6,221,181Million Won→2023 6,723,081Million Won▲ +8.1%
General road Value of construction completed in original contract
2008 462,796Million Won→2023 405,088Million Won▼ −12.5%
Value of construction completed in subcontract
2008 1,882,284Million Won→2023 2,538,132Million Won▲ +34.8%
Building construction Value of construction completed in subcontract
2008 655,132Million Won→2023 576,523Million Won▼ −12.0%
Detached & tenement house Value of construction completed in subcontract
2008 6,868Million Won→2023 15,249Million Won▲ +122.0%
Apartment Value of construction completed in subcontract
2008 39,184Million Won→2023 2,114Million Won▼ −94.6%
Residential shop Value of construction completed in subcontract
2008 19,385Million Won→2023 226Million Won▼ −98.8%
Market department store Value of construction completed in subcontract
2008 107,873Million Won→2023 13,095Million Won▼ −87.9%
Business building Value of construction completed in subcontract
2008 30,632Million Won→2023 20,653Million Won▼ −32.6%
Public building Value of construction completed in subcontract
2008 15,622Million Won→2023 15,359Million Won▼ −1.7%
Hotel & lodgings Value of construction completed in subcontract
2008 79,986Million Won→2023 12,550Million Won▼ −84.3%
Educational facilities Value of construction completed in subcontract
2008 100,087Million Won→2023 1,450Million Won▼ −98.6%
Hospital Value of construction completed in subcontract
2008 8,313Million Won→2023 9,213Million Won▲ +10.8%
Stadium & playground Value of construction completed in subcontract
2008 145Million Won→2023 640Million Won▲ +341.4%
Exhibition pavilion Value of construction completed in subcontract
2008 6,431Million Won→2023 953Million Won▼ −85.2%
Factory & workshop Value of construction completed in subcontract
2008 144,275Million Won→2023 444,633Million Won▲ +208.2%
Machine installation (except plant) Value of construction completed in subcontract
2008 27,033Million Won→2023 4Million Won▼ −100.0%
Substation power plant Value of construction completed in subcontract
2008 35,120Million Won→2023 6,558Million Won▼ −81.3%
Warehouse garage terminal building Value of construction completed in subcontract
2008 869Million Won→2023 25,676Million Won▲ +2854.7%
Other Building Facilities Value of construction completed in subcontract
2008 30,670Million Won→2023 8,149Million Won▼ −73.4%
Civil engineering Value of construction completed in subcontract
2008 774,085Million Won→2023 157,482Million Won▼ −79.7%
General road Value of construction completed in subcontract
2008 131,920Million Won→2023 10,335Million Won▼ −92.2%
Value of carry-over work
2008 96,399,850Million Won→2023 150,928,329Million Won▲ +56.6%
Building construction Value of carry-over work
2008 21,576,303Million Won→2023 32,965,109Million Won▲ +52.8%
Detached & tenement house Value of carry-over work
2008 191,969Million Won→2023 67,595Million Won▼ −64.8%
Apartment Value of carry-over work
2008 6,220,174Million Won→2023 8,967,690Million Won▲ +44.2%
Residential shop Value of carry-over work
2008 2,827,588Million Won→2023 473,907Million Won▼ −83.2%
Market department store Value of carry-over work
2008 764,294Million Won→2023 354,581Million Won▼ −53.6%
Business building Value of carry-over work
2008 1,526,086Million Won→2023 2,643,161Million Won▲ +73.2%
Public building Value of carry-over work
2008 103,017Million Won→2023 110,184Million Won▲ +7.0%
Hotel & lodgings Value of carry-over work
2008 1,774,027Million Won→2023 1,146,637Million Won▼ −35.4%
Educational facilities Value of carry-over work
2008 421,164Million Won→2023 174,885Million Won▼ −58.5%
Hospital Value of carry-over work
2008 563,945Million Won→2023 476,971Million Won▼ −15.4%
Church & temple Value of carry-over work
2010 9Million Won→2022 12,928Million Won▲ +143544.4%
Public & Performance Value of carry-over work
2008 17,097Million Won→2019 154Million Won▼ −99.1%
Stadium & playground Value of carry-over work
2008 0Million Won→2023 90,470Million Won
Exhibition pavilion Value of carry-over work
2008 238,068Million Won→2023 2,119Million Won▼ −99.1%
Factory & workshop Value of carry-over work
2008 1,683,143Million Won→2023 14,668,733Million Won▲ +771.5%
Machine installation (except plant) Value of carry-over work
2008 26,435Million Won→2023 65Million Won▼ −99.8%
Substation power plant Value of carry-over work
2008 1,782,266Million Won→2023 140,288Million Won▼ −92.1%
Warehouse garage terminal building Value of carry-over work
2008 1,482,834Million Won→2023 3,582,595Million Won▲ +141.6%
Hazardous property storehouse Value of carry-over work
2008 5,646Million Won→2023 8,354Million Won▲ +48.0%
Other Building Facilities Value of carry-over work
2008 1,948,277Million Won→2023 56,874Million Won▼ −97.1%
Civil engineering Value of carry-over work
2008 20,591,192Million Won→2023 30,810,844Million Won▲ +49.6%
General road Value of carry-over work
2008 1,707,956Million Won→2023 1,063,597Million Won▼ −37.7%
공사지역/등록업종별 계약액,기성액,미기성액(해외건설)
Back to top등록업종별 합계 · 공사지역별 총계
- Total Value of orders received in original contract
- General construction Value of orders received in original contract
- Special construction Value of orders received in original contract
- Excavating and earthmoving Value of orders received in original contract
- Boring & grouting works Value of orders received in original contract
- Interior architecture works Value of orders received in original contract
- Metal structure installation and Erection of doors and Greenhouse construction Value of orders received in original contract
- Roofing sheet metal prefabrication Value of orders received in original contract
- Plastering waterproofing construction business Value of orders received in original contract
- Steel Reinforcing and Reinforced Concrete Works Value of orders received in original contract
- Scaffolding demolition works Value of orders received in original contract
- Total Value of construction completed
- General construction Value of construction completed
- Special construction Value of construction completed
- Excavating and earthmoving Value of construction completed
- Pavement Value of construction completed
- Boring & grouting works Value of construction completed
- Interior architecture works Value of construction completed
- Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed
- Roofing sheet metal prefabrication Value of construction completed
- Painting works Value of construction completed
- Plastering waterproofing construction business Value of construction completed
- Stone works Value of construction completed
- Landscape Works Facility Value of construction completed
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed
- Scaffolding demolition works Value of construction completed
- Total Value of construction completed in original contract
- General construction Value of construction completed in original contract
- Special construction Value of construction completed in original contract
- Excavating and earthmoving Value of construction completed in original contract
- Interior architecture works Value of construction completed in original contract
- Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in original contract
- Total Value of construction completed in subcontract
- General construction Value of construction completed in subcontract
- Special construction Value of construction completed in subcontract
- Excavating and earthmoving Value of construction completed in subcontract
- Pavement Value of construction completed in subcontract
- Boring & grouting works Value of construction completed in subcontract
- Interior architecture works Value of construction completed in subcontract
- Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in subcontract
- Roofing sheet metal prefabrication Value of construction completed in subcontract
- Painting works Value of construction completed in subcontract
- Plastering waterproofing construction business Value of construction completed in subcontract
- Stone works Value of construction completed in subcontract
- Landscape Works Facility Value of construction completed in subcontract
- Steel Reinforcing and Reinforced Concrete Works Value of construction completed in subcontract
- Scaffolding demolition works Value of construction completed in subcontract
- Total Value of carry-over work
- General construction Value of carry-over work
- Special construction Value of carry-over work
- Excavating and earthmoving Value of carry-over work
- Pavement Value of carry-over work
- Boring & grouting works Value of carry-over work
- Interior architecture works Value of carry-over work
- Metal structure installation and Erection of doors and Greenhouse construction Value of carry-over work
- Roofing sheet metal prefabrication Value of carry-over work
- Painting works Value of carry-over work
- Plastering waterproofing construction business Value of carry-over work
- Stone works Value of carry-over work
- Landscape Works Facility Value of carry-over work
- Steel Reinforcing and Reinforced Concrete Works Value of carry-over work
- Scaffolding demolition works Value of carry-over work
Total Value of orders received in original contract
2013 67,905,801Mill. Won→2023 39,719,453Mill. Won▼ −41.5%
General construction Value of orders received in original contract
2013 63,917,442Mill. Won→2023 37,821,525Mill. Won▼ −40.8%
Special construction Value of orders received in original contract
2013 1,745,872Mill. Won→2023 589,613Mill. Won▼ −66.2%
Excavating and earthmoving Value of orders received in original contract
2013 235,973Mill. Won→2023 10,572Mill. Won▼ −95.5%
Boring & grouting works Value of orders received in original contract
2013 30,333Mill. Won→2023 27,510Mill. Won▼ −9.3%
Interior architecture works Value of orders received in original contract
2013 116,082Mill. Won→2023 20,853Mill. Won▼ −82.0%
Metal structure installation and Erection of doors and Greenhouse construction Value of orders received in original contract
2013 61,578Mill. Won→2023 5,584Mill. Won▼ −90.9%
Roofing sheet metal prefabrication Value of orders received in original contract
2013 154,855Mill. Won→2022 60,196Mill. Won▼ −61.1%
Plastering waterproofing construction business Value of orders received in original contract
2013 1,996Mill. Won→2023 89,567Mill. Won▲ +4387.3%
Steel Reinforcing and Reinforced Concrete Works Value of orders received in original contract
2013 87,074Mill. Won→2023 2,538Mill. Won▼ −97.1%
Scaffolding demolition works Value of orders received in original contract
2013 23,155Mill. Won→2023 36,878Mill. Won▲ +59.3%
Total Value of construction completed
2008 32,736,151Million Won→2023 40,571,761Million Won▲ +23.9%
General construction Value of construction completed
2008 30,388,527Million Won→2023 37,584,342Million Won▲ +23.7%
Special construction Value of construction completed
2008 974,938Million Won→2023 1,194,508Million Won▲ +22.5%
Excavating and earthmoving Value of construction completed
2008 90,147Million Won→2023 267,160Million Won▲ +196.4%
Pavement Value of construction completed
2008 327Million Won→2023 6,249Million Won▲ +1811.0%
Boring & grouting works Value of construction completed
2008 136,219Million Won→2023 51,026Million Won▼ −62.5%
Interior architecture works Value of construction completed
2008 99,202Million Won→2023 35,866Million Won▼ −63.8%
Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed
2008 52,019Million Won→2023 8,574Million Won▼ −83.5%
Roofing sheet metal prefabrication Value of construction completed
2008 16,337Million Won→2023 3,686Million Won▼ −77.4%
Painting works Value of construction completed
2008 1,542Million Won→2023 10,924Million Won▲ +608.4%
Plastering waterproofing construction business Value of construction completed
2008 7,938Million Won→2023 46,130Million Won▲ +481.1%
Stone works Value of construction completed
2008 1,713Million Won→2020 94Million Won▼ −94.5%
Landscape Works Facility Value of construction completed
2008 429Million Won→2023 402Million Won▼ −6.3%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed
2008 88,016Million Won→2023 4,513Million Won▼ −94.9%
Scaffolding demolition works Value of construction completed
2008 22,702Million Won→2023 7,181Million Won▼ −68.4%
Total Value of construction completed in original contract
2008 30,853,867Million Won→2023 38,033,629Million Won▲ +23.3%
General construction Value of construction completed in original contract
2008 29,506,453Million Won→2023 36,899,104Million Won▲ +25.1%
Special construction Value of construction completed in original contract
2008 205,479Million Won→2023 80,286Million Won▼ −60.9%
Excavating and earthmoving Value of construction completed in original contract
2008 1,382Million Won→2017 1,955Million Won▲ +41.5%
Interior architecture works Value of construction completed in original contract
2008 54,958Million Won→2023 5,813Million Won▼ −89.4%
Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in original contract
2008 22,983Million Won→2021 2,751Million Won▼ −88.0%
Total Value of construction completed in subcontract
2008 1,882,284Million Won→2023 2,538,132Million Won▲ +34.8%
General construction Value of construction completed in subcontract
2008 882,074Million Won→2023 685,238Million Won▼ −22.3%
Special construction Value of construction completed in subcontract
2008 769,458Million Won→2023 1,114,222Million Won▲ +44.8%
Excavating and earthmoving Value of construction completed in subcontract
2008 88,765Million Won→2023 267,160Million Won▲ +201.0%
Pavement Value of construction completed in subcontract
2008 326Million Won→2023 6,249Million Won▲ +1816.9%
Boring & grouting works Value of construction completed in subcontract
2008 89,640Million Won→2023 51,026Million Won▼ −43.1%
Interior architecture works Value of construction completed in subcontract
2008 44,243Million Won→2023 30,053Million Won▼ −32.1%
Metal structure installation and Erection of doors and Greenhouse construction Value of construction completed in subcontract
2008 29,035Million Won→2023 8,574Million Won▼ −70.5%
Roofing sheet metal prefabrication Value of construction completed in subcontract
2008 16,227Million Won→2023 3,686Million Won▼ −77.3%
Painting works Value of construction completed in subcontract
2008 1,346Million Won→2023 10,924Million Won▲ +711.6%
Plastering waterproofing construction business Value of construction completed in subcontract
2008 7,938Million Won→2023 46,130Million Won▲ +481.1%
Stone works Value of construction completed in subcontract
2008 1,691Million Won→2020 94Million Won▼ −94.4%
Landscape Works Facility Value of construction completed in subcontract
2008 358Million Won→2021 190Million Won▼ −46.9%
Steel Reinforcing and Reinforced Concrete Works Value of construction completed in subcontract
2008 88,016Million Won→2023 3,107Million Won▼ −96.5%
Scaffolding demolition works Value of construction completed in subcontract
2008 22,702Million Won→2023 6,993Million Won▼ −69.2%
Total Value of carry-over work
2008 96,399,850Million Won→2023 150,928,329Million Won▲ +56.6%
General construction Value of carry-over work
2008 94,117,855Million Won→2023 146,094,494Million Won▲ +55.2%
Special construction Value of carry-over work
2008 1,185,624Million Won→2023 1,673,159Million Won▲ +41.1%
Excavating and earthmoving Value of carry-over work
2008 112,824Million Won→2023 311,808Million Won▲ +176.4%
Pavement Value of carry-over work
2008 0Million Won→2023 13,269Million Won
Boring & grouting works Value of carry-over work
2008 110,997Million Won→2023 71,022Million Won▼ −36.0%
Interior architecture works Value of carry-over work
2008 69,117Million Won→2023 15,090Million Won▼ −78.2%
Metal structure installation and Erection of doors and Greenhouse construction Value of carry-over work
2008 64,157Million Won→2023 11,200Million Won▼ −82.5%
Roofing sheet metal prefabrication Value of carry-over work
2008 5,559Million Won→2023 54,062Million Won▲ +872.5%
Painting works Value of carry-over work
2008 489Million Won→2023 10,150Million Won▲ +1975.7%
Plastering waterproofing construction business Value of carry-over work
2008 1,990Million Won→2023 66,994Million Won▲ +3266.5%
Stone works Value of carry-over work
2008 1,432Million Won→2020 26Million Won▼ −98.2%
Landscape Works Facility Value of carry-over work
2008 825Million Won→2021 168Million Won▼ −79.6%
Steel Reinforcing and Reinforced Concrete Works Value of carry-over work
2008 119,824Million Won→2023 1,808Million Won▼ −98.5%
Scaffolding demolition works Value of carry-over work
2008 1,570Million Won→2023 38,851Million Won▲ +2374.6%
Data source
- Organization
- 국가데이터처
- Dataset
- 산업세분류 및 조직형태별 총괄
- Provider
- KOSIS 국가통계포털
- Period
- 2008 ~ 2023
- As of
- 2026-08-29
- Processing
- KOSIS OpenAPI 로 연간 전국값을 받아 그대로 사용. 가공 없음.
Other surveys in this category
- Construction Industry Survey1 tables · 102 items
- Construction Business Trend Survey13 tables · 159 items
- Building Permit, Start and Completion Statistics4 tables · 26 items
- Building Statistics1 tables · 113 items
- Urban Redevelopment Project Status5 tables · 26 items
- Overseas Construction Orders Statistics3 tables · 78 items